Illustrative · redactedCBOM excerpt — CycloneDX 1.7
Machine-readable inventory: every algorithm bound to where it was seen negotiating, scored with its NIST quantum security level, dependencies mapped.
{
"bomFormat": "CycloneDX",
"specVersion": "1.7",
"serialNumber": "urn:uuid:████",
"version": 4,
"metadata": {
"timestamp": "2026-07-14T02:11:09Z",
"component": { "type": "application",
"name": "core-banking-gw" }
},
"components": [
{ "type": "cryptographic-asset",
"name": "TLS1.2 · RSA-2048 · AES-128-CBC",
"cryptoProperties": {
"assetType": "protocol",
"protocolProperties": { "type": "tls" },
"nistQuantumSecurityLevel": 0 },
"evidence": { "occurrences": [
{ "location": "10.█.█.█:443" },
{ "location": "10.█.█.█:8443" } ] } },
{ "type": "cryptographic-asset",
"name": "SSH · sntrup761x25519",
"cryptoProperties": {
"assetType": "algorithm",
"algorithmProperties": {
"primitive": "kem" },
"nistQuantumSecurityLevel": 3 } }
],
"dependencies": [
{ "ref": "svc-payments",
"dependsOn": [ "TLS1.2 · RSA-2048" ] } ]
}
IllustrativeReadiness scorecard
Per-framework position driven by your migration-roadmap progress — every control Met, Partial or Gap, with evidence behind each row. PQCA scores per-control evidence across every framework it tracks — including SAMA (Saudi Central Bank) and the FIPS 140-3 / CMVP module transition (tracking). For FIPS 140-3 specifically, PQCA tracks your plan to move onto CMVP-certified modules. It does not validate modules, and it is not a substitute for CMVP.
NSA CNSA 2.0MetPartialGap
NIST IR 8547MetPartialGap
EU DORAMetPartialGap
PCI DSS 4.0MetPartialGap
UAE National Encryption PolicyMetPartialGap
One readiness number per framework, decomposable to the control — the format auditors ask to keep.
IllustrativeRoadmap extract — owner-assigned, budget-tracked
The migration as the board funds it: phased, owned, priced in your currency, tracked against the deadline clock.
Phase 02 · Assess
Crypto CoE · Q4 2026On track
Phase 03 · QRC-Budget
CISO office · Q1 2027On track
Phase 04 · Comply
GRC team · Q2 2027At risk
Phase 05 · Migrate — wave 1
Platform eng. · Q4 2027Planned
Budgets redacted here — in your copy they carry real figures in your own currency.
Illustrative · redacted · Arabic board report PDFتقرير مجلس الإدارة بالعربية — Arabic board report
The same board PDF, typeset in Arabic: contextual letter shaping, the lam-alef ligature (لا), right-to-left reordering, an Arabic organisation name and a classification footer — rendered from a bundled font, so it looks identical on an air-gapped server.
مجموعة الواحة المالية
تقرير مجلس الإدارة — الجاهزية للتشفير ما بعد الكمّي · الربع الثالث 2026
PQCA · BOARD REPORT · AR
- الخوارزميات المكتشفة
- 1,284
- المعرّضة للخطر الكمّي
- 312
- نسبة الجاهزية
- 61%
أعلى المخاطر — الأصول ذات الأولوية للانتقال
| الأصل | الخوارزمية | التصنيف | الاستحقاق |
|---|
| بوابة الخدمات البنكية الأساسية | TLS 1.2 · RSA-2048 | حرج | 31 Dec 2026 |
| منصة المدفوعات الفورية | ECDHE P-256 · ECDSA | عالٍ | 31 Mar 2027 |
| أرشيف السجلات الائتمانية | AES-128 · SHA-1 | متوسط | 30 Jun 2027 |
سري — للاستخدام الداخلي فقط · أُعدّ بواسطة PQCAIllustrative data · الصفحة 1 من 12